Project Description

Consulting services for preparing designs , tender documents and Continuous supervision the implementation of infrastructure works of AL Rokham  city

Project Details

DATE

From 10/2014 to 10/2017

Executive Department for Potable Water and Sewage

  • Survey / Soil Researches
  • Borings Works
  • Preliminary report.
  • Prepare the design of wastewater networks
  • Prepare the design of Force main lines including for wastewater
  • Hydraulic, Electromechanical, Architecture and Structural design for the general location of the wastewater pump station, WWTP station
  • Providing technical support during the stage of tendering, decision, and awarding.
  • Periodic construction supervision.