Project Description

Consulting services for preparing designs and tender documents and Continuous supervising the for infrastructure works of River Side of New City of Aswan

Project Details

DATE

From 1/2017 to 6/2018

New Urban Communities Authority New Aswan City Authority

 

  • Survey / Soil Researches
  • Borings Works
  • Preliminary report
  • Roads designs.
  • Hydraulic Design of networks (water – irrigation – wastewater).
  • Force mainline including (valves chambers – pipes tunnel).
  • Electromechanical, Architecture and Structural design for wastewater pumping stations
  • Periodic construction supervision.