Project Description
Consulting services for preparing designs and tender documents and Continuous supervising the for infrastructure works of River Side of New City of Aswan
Project Details
DATE
From 1/2017 to 6/2018
New Urban Communities Authority New Aswan City Authority
- Survey / Soil Researches
- Borings Works
- Preliminary report
- Roads designs.
- Hydraulic Design of networks (water – irrigation – wastewater).
- Force mainline including (valves chambers – pipes tunnel).
- Electromechanical, Architecture and Structural design for wastewater pumping stations
- Periodic construction supervision.