Project Description
Supplying al- Hamoul, Bulteem & Borolos villages with clear water through supplying networks and high tanks with Dia. 300/1200 mm and length of 70 Km
Project Details
DATE
From 6/2002 to 4/2003
National Authority for Water and Sanitary Drainage
- Survey / Soil Researches
- Borings Works
- Preliminary report.
- Prepare design of water carrier and raw water carrier.
- Hydraulic, Electromechanical, Architecture and Structural design for the general location of the elevated tank, Intake pump station,
- Providing technical support during the stage of tendering, decision and awarding.
- Periodic construction supervision.